Critical Path Analysis and Other Project Network Techniques
Author(s)
Lockyer, Keith G.
Lockyer, Keith G.
Name in long format: | Critical Path Analysis and Other Project Network Techniques |
---|---|
ISBN-10: | 0273034162 |
ISBN-13: | 9780273034162 |
Book pages: | 256 |
Book language: | en |
Edition: | 5 |
Binding: | Hardcover |
Publisher: | Beekman Books Inc |
Dimensions: | Height: 9.17321 Inches, Length: 6.06298 Inches, Weight: 0.82893810512 Pounds, Width: 0.55118 Inches |